Trelleborg supplies products to LNG terminal

Trelleborg A.B.’s marine systems operation supplied a suite of products to H-Energy’s Floating Storage Regasification Unit based liquefied natural gas (LNG) terminal at JSW Infrastructure’s Jaigarh Port in India.

According to a company statement, it provided its quick release hook units, environmental monitoring system, SmartDock docking aid system and central integrated monitoring system. The suite falls under the company’s SmartPort portfolio.

The project was managed by Trelleborg’s projects team in Melbourne, Australia, while engineers from its engineering and design center of excellence in Ahmedabad, India, carried out the inspection and commissioning of the mooring equipment, as well as attended the berthing of the FSRU.

When operational in the fourth quarter of 2018, the regasified LNG will be supplied to customers through a 37-mile tie-in pipeline which will be connected to a national gas grid at Dabhol, India. The terminal, with an annual capacity of 4 million metric tons per year, will offer storage, regasification, reloading, fuel bunkering and truck loading facilities for industry energy demands.

Image courtesy of Trelleborg.